... water discharge pressure 排水压力 water discharge time 排水时间 water discharge valve 排水阀 ...
基于48个网页-相关网页
Shallow buried-tunnelling method was used in the construction of high discharge pressure culvert for the first time and developed a new construction method in urban water distribution project.
在设计中将浅埋暗挖技术首次应用于大流量有压输水暗涵,进一步拓展了适用于城市输水工程的工程技术手段。
Base on the relationships between nutrient concentration and water discharge and time, temporal models of nutrient transport can be built.
根据营养盐含量与流量的关系以及含量随时间的变化的关系,可以建立它们输送量的时间变化模型。
At the same time this paper discussed the relation between water and soil conservation and break-off discharge in the Yellow River, dried soil layer.
同时对黄河断流以及土壤干层与水土保持建设的关系进行了探讨。
应用推荐